
3 modelsAion website
All 3 variants from a full battery, ranked like the long range comparison.
#1No longer soldAion Hyper GT 710 SuperchargedSedan · RWD · 77.0 kWh batteryMotor 250 kW (335 hp)No longer sold new5 h 38 minFastest5 h 19 min driving1 stop, 19 min17.3 kWh/100 km5 h 38 minFastest
#2Aion VSUV · FWD · 75.0 kWh batteryMotor 150 kW (201 hp)from €23,4785 h 57 min+19 min5 h 19 min driving2 stops, 38 min22.6 kWh/100 km5 h 57 min+19 min
#3Aion UTHatchback · FWD · 58.0 kWh batteryMotor 150 kW (201 hp)from €16,1736 h 46 min+1 h 8 min5 h 19 min driving3 stops, 1 h 28 min20.8 kWh/100 km6 h 46 min+1 h 8 min