
Power
375 kW
(510 HP)
0-100 km/h
4.5 s
Top Speed
170 km/h
Battery Options
Similar Electric Vehicles
View All Trucks →
Chevrolet Silverado EV 4WT
Power:
380 kW (516 HP)
0-100 km/h:
4.5 s
Price data not available
Charging Curve & Charging Speed Analysis
Battery Options
Gross Capacity:
200 kWh
Net Capacity:
190 kWh
Buffer:
5%
Charging Curve
Average Charging Power
219.3 kW
(1.15 C)
Maximum Charging Power
345.0 kW
(1.82 C) at 14 → 25% SOC
Minimum Charging Power
15.0 kW
0-100% Charging Time
2 h 6 min
Optimal Charging Strategy
Optimal SOC Range
1% → 62%
Charging Time
24 min
Energy Added
124.6 kWh
Effective Charging Power
253.0 kW
This shows the best SOC range where you get the most energy for your time spent charging. Calculations include a 5-minute overhead time for station access, plugging in, and setup.
State of Charge over Time
SOC Range | Charging Time | Avg. Power | Avg. C-Rate | Energy Added |
---|---|---|---|---|
0% → 100% | 2 h 6 min | 219.3 kW | 1.15 C | 204.3 kWh |
0% → 90% | 1 h 21 min | 240.2 kW | 1.26 C | 183.8 kWh |
0% → 80% | 47 min | 264.4 kW | 1.39 C | 163.4 kWh |
5% → 100% | 2 h 4 min | 215.0 kW | 1.13 C | 194.1 kWh |
5% → 90% | 1 h 19 min | 236.6 kW | 1.25 C | 173.7 kWh |
5% → 80% | 45 min | 261.9 kW | 1.38 C | 153.3 kWh |
10% → 100% | 2 h 2 min | 208.0 kW | 1.09 C | 183.8 kWh |
10% → 90% | 1 h 17 min | 230.0 kW | 1.21 C | 163.4 kWh |
10% → 80% | 43 min | 256.2 kW | 1.35 C | 143.0 kWh |